Zhomb Creative | Portfolio Tags Brisbane
288
archive,tax-portfolio_tag,term-brisbane,term-288,ajax_fade,page_not_loaded,,vertical_menu_enabled, vertical_menu_hidden,vertical_menu_hidden_with_logo, vertical_menu_width_260,side_area_uncovered_from_content,qode-theme-ver-10.1.1,wpb-js-composer js-comp-ver-6.2.0,vc_responsive

Archive

 

Working in-house on a full time basis, I worked closely with, and under direction from the Project Manager and Mechanical Engineer to complete this project by the given deadlines. I was responsible for 3D modelling of the Screens, Fins and Awnings. These were then detailed in fabrication drawings for sign off by the Consulting Structural Engineer, and were then delivered to the Fabrication Team for cutting, welding, assembly, painting and transportation to the Townsville Central site. I was responsible for all file creation and management. This included preparation and delivery to the water-jet, laser cutting and other sheet metal fabrication being outsourced. Design and consideration, site measures, production management, and logistical assistance were also provided as required. Find out more about Hutchinson Builders.

 

I was contracted to provide 3D modelling and design assistance by Project Manager Tim Stevenson. The 3D modelling aspect spanned 5 configurations of cubicle layouts with 2 types of roofs to suit each, and the client had requested these to be deliverable in one 3D Assembly. Tim had a strong vision to deliver to the highest level of durability, vandal resistance, and design refinement. My role centered around the structure, roofing and signage with design exploration conducted into many other areas of the project. Once the 3D model had been refined to a high state, the Client took over to construct a prototype with which to identify outstanding components requiring resolution. Find out more at Landmark Products.